"How long will this take" is usually the second question after cost, and the honest answer depends on which stage you are counting from. Here is a realistic breakdown of every stage, from first conversation to opening day.
← All GuidesEvery fit-out we deliver moves through the same six stages regardless of size: Discovery & Brief, Concept Presentation, Technical Design & Drawings, Authority Approvals, Build, and Handover. The stages do not fully run in sequence — technical drawings and authority submissions often overlap — but understanding each one is the difference between a realistic timeline and a guess.
Once design is approved and construction begins, build duration itself varies by category. A standard 90–190 sq m retail unit typically takes 6–10 weeks from approved design to opening. Restaurant and F&B fit-outs generally run longer than retail of the same size due to kitchen equipment lead times, extraction system installation and additional food authority inspections. A bespoke kitchen renovation inside a villa typically takes 2–4 weeks from design and manufacture through to installation, while a full villa renovation covering multiple rooms is sequenced in phases and quoted individually based on scope.
The single biggest timeline risk is not construction itself — it is changes made after design approval. Every revision after a concept or technical drawing has been signed off resets part of the approval and procurement process behind it. The second most common cause is mall handover condition: a unit handed over with existing MEP infrastructure moves faster than a raw shell requiring full base-build coordination.
The most reliable way to protect a timeline is having design, technical drawings, authority submission and construction managed by one team, so nothing waits on a handoff between separate companies.